Current Date : 02/10/11 Current Time : 08:32 Daily Data Report - Hourly Averages East Tennessee Technology Park 02/09/11 Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : TEMP10 TEMP60 TEMP10F TEMP60F DTEMP60 DEWPT10 DEWPT10F REL_HUM BP_IN BP_MB Units : DEGC DEGC DEGF DEGF DEGC DEGC DEGF PCT IN MB Hour -------------------------------------------------------------------------------------------------------------- 00 -4.5 -4.5 23.8 23.9 .0 -8.0 17.6 77.0 29.33 993.1 01 -5.2 -4.8 22.7 23.3 .3 -7.5 18.5 83.9 29.33 993.3 02 -5.2 -5.0 22.6 23.0 .2 -8.2 17.3 80.3 29.33 993.2 03 -5.2 -5.2 22.7 22.6 .0 -8.0 17.5 80.5 29.35 993.9 04 -4.8 -5.1 23.3 22.8 -.3 -8.1 17.4 78.3 29.34 993.7 05 -4.5 -4.7 24.0 23.6 -.2 -7.9 17.8 77.5 29.32 992.9 06 -4.2 -4.3 24.4 24.2 -.1 -8.1 17.3 74.5 29.32 992.8 07 -4.3 -4.5 24.3 23.9 -.2 -8.4 16.8 73.2 29.31 992.7 08 -3.9 -4.4 25.0 24.0 -.5 -8.5 16.6 70.5 29.32 993.1 09 -3.1P -3.8P 26.4P 25.2P -.7P -9.9P 14.2P 60.4P 29.32P 992.8P 10 -1.7 -2.2 28.9 28.1 -.5 -13.8 7.1 39.4 29.29 991.9 11 -.2 -1.0 31.6 30.2 -.8 -12.3 9.9 40.1 29.25 990.6 12 1.2 .5 34.2 32.9 -.7 -11.4 11.5 38.8 29.20 989.0 13 2.3 1.5 36.2 34.8 -.8 -10.9 12.4 37.4 29.16 987.5 14 2.9 2.2 37.2 36.0 -.7 -10.2 13.7 38.0 29.13 986.4 15 3.2 2.6 37.8 36.7 -.6 -10.1 13.9 37.5 29.12 986.1 16 3.6 3.0 38.5 37.4 -.6 -9.7 14.5 37.5 29.11 986.0 17 3.0 2.5 37.3 36.5 -.5 -8.1 17.4 44.4 29.13 986.3 18 2.2 1.7 35.9 35.1 -.4 -7.2 19.1 50.4 29.15 987.1 19 1.7 1.3 35.1 34.4 -.4 -6.4 20.4 55.2 29.13 986.6 20 -.5 -1.0 31.1 30.2 -.5 -3.9 25.0 79.5 29.15 987.3 21 -1.4 -1.8 29.5 28.7 -.4 -2.0 28.5 96.3 29.15 987.1 22 -1.3 -1.8 29.6 28.8 -.5 -1.6 29.0 98.2 29.13 986.6 23 -1.6 -2.1 29.1 28.2 -.5 -2.3 27.9 95.9 29.14 986.9 Max : 3.6 3.0 38.5 37.4 .3 -1.6 29.0 98.2 29.35 993.9 Min : -5.2 -5.2 22.6 22.6 -.8 -13.8 7.1 37.4 29.11 986.0 Mean : -1.3 -1.7 29.6 28.9 -.4 -8.0 17.6 64.4 29.23 989.9 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 2 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 02/09/11 (continued) Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : SOLAR_LG SOLARWM2 PRECIP_I PRECIP_M WDIR10M WDIR60M VWDIR10 VWDIR60 STH10 STH60 Units : LANGLEY WATTS_M2 IN MM DEG DEG DEG DEG DEG DEG Hour -------------------------------------------------------------------------------------------------------------- 00 .00 -4.1 .00 .0 160 72 193 73 49 9 01 .00 -4.0 .00 .0 1 61 356 60 42 9 02 .00 -4.0 .00 .0 32 6 56 19 51 24 03 .00 -4.0 .00 .0 27 322 37 323 28 11 04 .00 -3.9 .00 .0 57 19 63 15 31 18 05 -.01 -3.9 .00 .0 68 62 83 64 54 8 06 .00 -3.9 .00 .0 36 55 43 56 51 8 07 .01 4.5 .00 .0 59 58 63 59 43 8 08 .08 58.4 .00 .0 76 68 79 68 30 10 09 .31P 215.2P .00 .0 40P 51P 44P 53P 51P 28P 10 .72 499.9 .00 .0 346 22 351 20 68 44 11 .85 592.4 .00 .0 248 247 251 247 46 33 12 .85 590.3 .00 .0 288 270 281 266 37 32 13 .46 324.2 .00 .0 265 260 260 254 40 27 14 .34 237.3 .00 .0 346 350 350 350 33 26 15 .23 157.7 .00 .0 324 319 321 316 28 20 16 .16 112.8 .00 .0 340 331 340 333 28 17 17 .02 15.2 .00 .0 335 324 334 324 22 8 18 .00 -2.5 .00 .0 322 308 320 312 45 40 19 .00 -3.6 .00 .0 101 143 147 153 42 47 20 .00 -3.8 .01 .3 334 321 330 319 26 11 21 .00 -3.7 .01 .2 6 11 8 9 51 22 22 .00 -3.7 Trace Trace 355 13 357 23 34 24 23 .00 -3.8 Trace Trace 338 332 336 326 32 20 Max : .85 592.4 .01 .3 355 350 357 350 68 47 Min : -.01 -4.1 .00 .0 1 6 8 9 22 8 Mean : .17 115.0 Trace Trace 4 3 340 2 40 21 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 3 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 02/09/11 (continued) Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : WS10MS WS60MS WSPD10 WSPD60 PKWS10 PKWS60 24HR_PRS 24HR_PR Units : M/S M/S MPH MPH MPH MPH IN IN Hour -------------------------------------------------------------------------------------------------------------- 00 .3 1.5 .7 3.4 2.1 7.1 .00 .00 01 .5 1.7 1.1 3.8 2.3 6.0 .00 .00 02 .8 2.7 1.7 6.1 6.9 12.1 .00 .00 03 .5 1.3 1.1 3.0 3.2 5.3 .00 .00 04 .4 1.1 .8 2.6 2.3 4.8 .00 .00 05 .3 2.0 .7 4.4 4.4 8.7 .00 .00 06 .4 2.9 .9 6.4 4.8 11.4 .00 .00 07 .5 3.1 1.1 6.8 5.7 11.4 .00 .00 08 .9 2.6 2.0 5.9 6.2 10.1 .00 .00 09 .7P 1.5P 1.5P 3.4P P P ,00 .00 10 .9 1.0 2.0 2.2 5.5 6.9 .00 .00 11 1.3 1.1 3.0 2.4 7.8 6.6 .00 .00 12 1.6 1.4 3.5 3.2 10.5 10.1 .00 .00 13 1.3 1.5 3.0 3.3 8.5 10.1 .00 .00 14 1.2 2.2 2.6 5.0 7.6 9.2 .00 .00 15 1.4 2.5 3.1 5.5 8.9 11.9 .00 .00 16 1.8 4.1 3.9 9.2 11.4 15.8 .00 .00 17 1.4 3.8 3.0 8.5 8.5 13.5 .00 .00 18 .9 2.2 2.1 4.9 6.9 9.4 .00 .00 19 1.7 3.1 3.7 6.9 17.2 25.0 .00 .00 20 1.4 3.8 3.1 8.5 9.8 15.6 .01 .01 21 .5 1.1 1.0 2.5 3.7 6.6 .01 .02 22 .5 1.2 1.1 2.8 4.1 8.5 Trace .02 23 .7 1.8 1.5 4.1 7.3 10.1 Trace .02 Max : 1.8 4.1 3.9 9.2 17.2 25.0 .01 .02 Min : .3 1.0 .7 2.2 2.1 4.8 .00 .00 Mean : .9 2.1 2.0 4.8 6.8 10.3 Trace Trace Hours : 24 24 24 24 23 23 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc.