Current Date : 04/08/11 Current Time : 08:57 Daily Data Report - Hourly Averages East Tennessee Technology Park 04/07/11 Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : TEMP10 TEMP60 TEMP10F TEMP60F DTEMP60 DEWPT10 DEWPT10F REL_HUM BP_IN BP_MB Units : DEGC DEGC DEGF DEGF DEGC DEGC DEGF PCT IN MB Hour -------------------------------------------------------------------------------------------------------------- 00 15.7 16.3 60.2 61.4 .6 -.1 31.8 34.7 29.05 983.8 01 14.6 15.7 58.2 60.2 1.1 .4 32.7 38.6 29.06 984.0 02 13.0 14.8 55.4 58.6 1.8 1.3 34.4 45.7 29.06 984.1 03 10.6 13.9 51.0 57.0 3.3 2.6 36.7 58.5 29.06 984.0 04 8.1 12.9 46.6 55.3 4.8 4.1 39.4 76.7 29.07 984.3 05 7.6 11.9 45.6 53.4 4.3 3.4 38.1 75.7 29.08 984.8 06 6.5 11.8 43.7 53.3 5.3 2.9 37.3 78.9 29.09 985.1 07 6.0 11.4 42.8 52.5 5.4 3.4 38.1 84.1 29.10 985.6 08 8.1 12.1 46.6 53.7 4.0 .5 32.9 59.7 29.12 986.2 09 12.6 12.3 54.8 54.2 -.3 .0 32.0 42.8 29.12 986.1 10 15.6 14.4 60.1 57.9 -1.2 .1 32.2 35.4 29.11 985.7 11 17.9 16.3 64.2 61.4 -1.6 1.5 34.7 33.9 29.09 985.1 12 19.5 18.2 67.1 64.7 -1.3 3.7 38.7 36.0 29.07 984.4 13 20.8 19.6 69.4 67.3 -1.2 5.6 42.0 37.7 29.05 983.6 14 22.5 20.7 72.5 69.3 -1.8 5.3 41.6 33.6 29.02 982.9 15 23.4 21.5 74.2 70.7 -1.9 4.9 40.8 30.8 29.00 982.1 16 23.3 21.8 74.0 71.2 -1.5 5.0 40.9 31.2 28.98 981.4 17 23.2 22.0 73.8 71.6 -1.2 5.3 41.6 32.2 28.96 980.9 18 22.9 22.2 73.2 72.0 -.7 6.1 43.0 34.6 28.97 981.0 19 22.0 21.8 71.6 71.2 -.3 7.6 45.6 40.2 28.97 980.9 20 20.7 21.0 69.3 69.8 .3 9.0 48.2 48.0 28.97 981.1 21 19.7 20.2 67.4 68.4 .5 10.0 49.9 54.5 28.99 981.6 22 18.3 19.2 65.0 66.6 .9 11.1 51.9 63.7 29.00 982.1 23 17.3 18.4 63.2 65.2 1.1 11.3 52.4 68.9 29.00 982.0 Max : 23.4 22.2 74.2 72.0 5.4 11.3 52.4 84.1 29.12 986.2 Min : 6.0 11.4 42.8 52.5 -1.9 -.1 31.8 30.8 28.96 980.9 Mean : 16.2 17.1 61.2 62.8 .9 4.4 39.9 49.0 29.04 983.5 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 2 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 04/07/11 (continued) Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : SOLAR_LG SOLARWM2 PRECIP_I PRECIP_M WDIR10M WDIR60M VWDIR10 VWDIR60 STH10 STH60 Units : LANGLEY WATTS_M2 IN MM DEG DEG DEG DEG DEG DEG Hour -------------------------------------------------------------------------------------------------------------- 00 .00 -2.9 .00 .0 232 246 230 246 10 5 01 .00 -2.8 .00 .0 231 246 231 246 10 4 02 .00 -3.2 .00 .0 220 259 218 258 29 5 03 .00 -3.2 .00 .0 47 268 79 268 54 7 04 .00 -3.3 .00 .0 201 279 217 276 43 8 05 .00 -3.4 .00 .0 347 341 348 305 53 30 06 .00 -3.4 .00 .0 189 3 214 1 42 19 07 .04 25.7 .00 .0 176 355 162 350 41 26 08 .29 200.7 .00 .0 200 296 195 292 19 7 09 .59 409.5 .00 .0 205 261 216 262 25 12 10 .88 611.1 .00 .0 247 251 249 251 25 18 11 1.09 759.3 .00 .0 214 229 213 228 38 20 12 1.16 812.3 .00 .0 238 243 240 243 44 30 13 1.27 887.7 .00 .0 228 240 225 240 39 27 14 1.24 865.6 .00 .0 241 250 238 247 42 22 15 1.12 779.3 .00 .0 227 235 228 236 37 26 16 .72 502.6 .00 .0 206 226 210 228 32 28 17 .42 290.7 .00 .0 205 222 209 224 24 16 18 .18 126.8 .00 .0 252 263 257 265 26 18 19 .03 22.1 .00 .0 232 257 233 257 15 8 20 .00 -2.0 .00 .0 220 242 215 243 15 6 21 .00 -2.4 .00 .0 198 218 195 218 24 9 22 .00 -2.7 .00 .0 211 231 214 232 32 7 23 .00 -2.9 .00 .0 183 222 178 222 28 7 Max : 1.27 887.7 .00 .0 347 355 348 350 54 30 Min : .00 -3.4 .00 .0 47 3 79 1 10 4 Mean : .38 260.9 .00 .0 218 255 225 247 31 15 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 3 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 04/07/11 (continued) Logger Id : 1K Logger Name : ETTP Tower K (1208) Interval : 001H Param : WS10MS WS60MS WSPD10 WSPD60 PKWS10 PKWS60 24HR_PRS 24HR_PR Units : M/S M/S MPH MPH MPH MPH IN IN Hour -------------------------------------------------------------------------------------------------------------- 00 1.8 4.4 4.0 9.8 6.9 15.3 .00 .00 01 1.4 4.3 3.1 9.7 7.8 14.7 .00 .00 02 .3 3.0 .7 6.7 3.4 9.6 .00 .00 03 .2 2.3 .4 5.2 3.2 9.6 .00 .00 04 .3 2.1 .7 4.7 2.7 10.5 .00 .00 05 .2 .3 .5 .7 2.1 4.6 .00 .00 06 .3 .8 .6 1.8 2.5 3.0 .00 .00 07 .2 1.1 .5 2.4 3.4 4.6 .00 .00 08 .4 2.1 .8 4.6 2.3 8.0 .00 .00 09 .8 2.7 1.9 5.9 6.9 9.2 .00 .00 10 2.0 2.3 4.4 5.2 8.5 10.3 .00 .00 11 1.8 2.2 3.9 5.0 11.2 9.8 .00 .00 12 1.7 2.2 3.9 4.9 10.1 10.3 .00 .00 13 2.2 2.8 4.9 6.3 12.1 15.3 .00 .00 14 2.3 3.0 5.2 6.7 13.1 15.1 .00 .00 15 3.0 3.8 6.8 8.6 15.1 15.1 .00 .00 16 2.4 3.2 5.4 7.1 13.7 16.7 .00 .00 17 2.4 3.5 5.3 7.7 12.1 16.3 .00 .00 18 2.4 3.1 5.3 7.0 10.5 11.9 .00 .00 19 1.3 2.6 2.9 5.8 5.5 8.7 .00 .00 20 1.4 3.5 3.1 7.9 7.3 11.7 .00 .00 21 1.1 3.6 2.4 8.0 8.7 15.6 .00 .00 22 .5 2.9 1.1 6.4 3.9 11.0 .00 .00 23 .7 3.0 1.7 6.6 4.8 12.6 .00 .00 Max : 3.0 4.4 6.8 9.8 15.1 16.7 .00 .00 Min : .2 .3 .4 .7 2.1 3.0 .00 .00 Mean : 1.3 2.7 2.9 6.0 7.4 11.2 .00 .00 Hours : 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc.