Current Date : 10/24/10 Current Time : 06:30 Daily Data Report - Hourly Averages East Tennessee Technology Park 10/23/10 Logger Id : 1L Logger Name : ETTP Tower L (1209) Interval : 001H Param : TEMP10 TEMP30 TEMP10F TEMP30F DTEMP30 BP_IN BP_MB SOLAR_LG SOLARWM2 PRECIP_I Units : DEGC DEGC DEGF DEGF DEGC IN MB LANGLEY WATTS_M2 IN Hour ------------------------------------------------------------------------------------------------------------- 00 6.5 7.2 43.7 44.9 0.6 29.39 995.2 0.00 -2.3 0.00 01 6.1 6.5 43.0 43.6 0.4 29.38 995.1 0.00 -2.2 0.00 02 5.6 5.9 42.0 42.6 0.3 29.40 995.6 0.00 -2.2 0.00 03 5.0 5.4 40.9 41.7 0.4 29.40 995.6 0.00 -2.2 0.00 04 4.5 4.7 40.2 40.5 0.2 29.39 995.3 0.00 -2.4 0.00 05 4.3 4.4 39.7 40.0 0.1 29.40 995.7 0.00 -2.1 0.00 06 3.8 4.3 38.9 39.7 0.4 29.42 996.3 0.00 -2.3 0.00 07 3.4 3.7 38.1 38.6 0.3 29.43 996.5 0.00 -0.8 0.00 08 3.7 3.8 38.6 38.8 0.1 29.43 996.7 0.12 83.1 0.00 09 6.3 6.0 43.3 42.9 -0.2 29.45 997.2 0.38 267.8 0.00 10 10.8 10.5 51.5 50.9 -0.3 29.45 997.2 0.65 453.2 0.00 11 14.7 14.1 58.4 57.3 -0.6 29.44 996.9 0.86 601.0 0.00 12 17.4 16.8 63.3 62.3 -0.6 29.42 996.4 0.96 667.1 0.00 13 19.7 19.2 67.5 66.5 -0.6 29.40 995.5 0.95 662.7 0.00 14 21.4 20.8 70.5 69.5 -0.6 29.36 994.2 0.89 623.6 0.00 15 22.9 22.5 73.2 72.5 -0.4 29.34 993.5 0.65 452.8 0.00 16 23.1 22.8 73.6 73.0 -0.3 29.33 993.3 0.36 249.5 0.00 17 22.1 22.4 71.8 72.2 0.3 29.33 993.1 0.14 100.0 0.00 18 19.2 20.5 66.5 68.9 1.3 29.32 992.8 0.02 17.0 0.00 19 16.7 18.0 62.1 64.3 1.2 29.33 993.2 0.00 -2.2 0.00 20 14.9 16.0 58.8 60.8 1.1 29.34 993.5 0.00 -2.1 0.00 21 13.6 14.3 56.5 57.8 0.7 29.34 993.5 0.00 -2.2 0.00 22 12.5 13.2 54.4 55.8 0.7 29.34 993.5 0.00 -2.2 0.00 23 11.5 12.5 52.6 54.5 1.1 29.35 993.9 0.00 -2.1 0.00 Max : 23.1 22.8 73.6 73.0 1.3 29.45 997.2 0.96 667.1 0.00 Min : 3.4 3.7 38.1 38.6 -0.6 29.32 992.8 0.00 -2.4 0.00 Mean : 12.1 12.3 53.7 54.2 0.2 29.38 995.0 0.25 172.9 0.00 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 2 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 10/23/10 (continued) Logger Id : 1L Logger Name : ETTP Tower L (1209) Interval : 001H Param : PRECIP_M WDIR10M WDIR30M VWDIR1 VWDIR3 STH10 STH30 WS10MS WS30MS WSPD10 Units : MM DEG DEG DEG DEG DEG DEG M/S M/S MPH Hour ------------------------------------------------------------------------------------------------------------- 00 0.0 81 92 85 68 13 42 0.5 0.4 1.1 01 0.0 102 216 110 76 25 31 0.5 0.5 1.1 02 0.0 112 156 106 194 47 26 0.4 0.3 0.8 03 0.0 51 61 64 57 51 52 0.8 1.0 1.9 04 0.0 61 65 55 76 51 31 0.6 0.8 1.3 05 0.0 104 116 92 70 56 40 0.3 0.2 0.7 06 0.0 69 59 74 83 33 38 0.4 0.2 0.8 07 0.0 77 55 77 50 15 11 0.6 0.9 1.4 08 0.0 70 55 74 43 19 27 0.3 0.5 0.6 09 0.0 117 54 126 36 60 66 0.2 0.2 0.4 10 0.0 195 357 202 322 65 61 0.6 0.4 1.2 11 0.0 213 228 214 226 44 56 0.8 0.6 1.9 12 0.0 214 220 236 242 50 44 1.0 1.1 2.3 13 0.0 225 232 241 247 47 39 1.2 1.3 2.7 14 0.0 241 239 248 245 44 37 1.2 1.3 2.7 15 0.0 298 293 287 289 61 48 1.4 1.5 3.1 16 0.0 276 277 276 276 25 18 1.6 2.0 3.6 17 0.0 252 305 296 299 25 32 0.6 1.0 1.4 18 0.0 136 112 111 95 29 44 0.3 0.6 0.8 19 0.0 129 132 114 99 23 30 0.3 0.3 0.6 20 0.0 105 97 104 97 25 33 0.2 0.2 0.4 21 0.0 91 27 80 51 47 33 0.3 0.3 0.6 22 0.0 65 33 75 34 23 17 0.2 0.8 0.5 23 0.0 76 42 74 46 12 14 0.4 0.8 1.0 Max : 0.0 298 357 296 322 65 66 1.6 2.0 3.6 Min : 0.0 51 27 55 34 12 11 0.2 0.2 0.4 Mean : 0.0 112 71 225 322 37 36 0.6 0.7 1.4 Hours : 24 24 24 24 24 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc. Page : 3 of 3 Daily Data Report - Hourly Averages East Tennessee Technology Park 10/23/10 (continued) Logger Id : 1L Logger Name : ETTP Tower L (1209) Interval : 001H Param : WSPD30 PKWS10 PKWS30 24HR_PRS 24HR_PR Units : MPH MPH MPH IN IN Hour ------------------------------------------------------------------------------------------------------------- 00 0.9 2.5 3.4 0.00 0.00 01 1.2 2.9 3.9 0.00 0.00 02 0.8 2.2 2.7 0.00 0.00 03 2.2 6.1 6.0 0.00 0.00 04 1.9 3.2 6.6 0.00 0.00 05 0.4 2.7 2.3 0.00 0.00 06 0.5 3.6 3.7 0.00 0.00 07 2.1 2.7 3.9 0.00 0.00 08 1.1 2.0 3.2 0.00 0.00 09 0.4 2.2 2.3 0.00 0.00 10 0.9 5.9 4.1 0.00 0.00 11 1.3 4.8 4.6 0.00 0.00 12 2.4 8.2 8.2 0.00 0.00 13 3.0 8.4 8.9 0.00 0.00 14 2.8 8.2 7.3 0.00 0.00 15 3.3 7.7 9.2 0.00 0.00 16 4.6 7.7 8.7 0.00 0.00 17 2.2 4.5 5.0 0.00 0.00 18 1.3 3.4 4.1 0.00 0.00 19 0.6 2.2 2.1 0.00 0.00 20 0.4 2.5 1.6 0.00 0.00 21 0.6 2.5 2.7 0.00 0.00 22 1.7 2.7 3.7 0.00 0.00 23 1.7 2.5 4.4 0.00 0.00 Max : 4.6 8.4 9.2 0.00 0.00 Min : 0.4 2.0 1.6 0.00 0.00 Mean : 1.6 4.2 4.7 0.00 0.00 Hours : 24 24 24 24 24 Data : '<' - Less than ##% Data, 'P' - Power Fail, 'D' - Disabled, 'T' - Out-of-Control, 'F' - Boiler Off-Line, Flags : 'B' - Bad Status, 'C' - Calibration, 'M' - Maintenance, 'O' - Analog Overrange, 'U' - Analog Underrange, 'A' - Arithmetic Error, '+' - Maximum, '-' - Minimum, 'R' - Rate of Change, 'H' - High-High Alarm, 'L' - Low-Low Alarm, 'h' - High Alarm, 'l' - Low Alarm, 'J' - High Rate of Change, 'j' - Low Rate of Change, 'V' - DIS #1 Obs, 'W' - DIS #2 Obs, 'X' - DIS #3 Obs, 'Y' - DIS #4 Obs, 'Z' - DIS #5 Obs, 'f' - Floor Exceeded, 'c' - Ceiling Exc.